You may do this 1 per day and roof rafters can handle more stress.
Roof plate level.
Another way when the roof is too large for that or there are not four corners is to use the 3 4 5 method shown here to make sure the corners are at a perfect 90 degrees.
Flat or low slope roofs may develop leaks because of poor drainage.
Since the overhang is 16 inches or 1 33 feet the total buildup equals.
These are typically 1 2 m long with a cranked end and are fixed to the wall plate at 2 m centres.
As the mortar does not bond the wall plate to the wall steel straps are used to ensure that the roof structure remains secure.
So the plate must be built up 1 6 inches per level foot of overhang.
1 33 feet x 1 6 inches per foot 2 13 or 2 1 8 inches.
To level the wall plates i find the straightest joist lay it from one wall plate to the other and put an 1800mm spirit level on it.
In this case with unit rises of 8 inches and 9 5 8 inches the difference is 1 5 8 or 1 6 inches.
They should be fixed firmly to the brick or blockwork underneath.
Generally wall plates are in lengths of not less than 3 m.
Adjustments may need to be made before you start the roof by measuring your span.
Now take your jack and jack up the ridge.
The span is the measurement from the outside of one wall plate to the outside of the opposite wall plate.
Jack up until level the frame a wall 16 on center between the 2x4 s that will serve as the top and bottom plate.
There are many reasons for a homeowner to want to change the pitch or slope of a roof.