Allow for a minimum of 18.
Roof panel installation.
If yours do not then you will need to drill holes.
Measure one panel width in from the roof edge.
Place the leading edge of the first panel along this line.
Panel installation should begin at the gable end of the roof opposite the prevailing rain bearing wind this will provide added assurance against wind driven rain being forced under the laps.
Be sure the larger edge is laid so that the small edge of the next panel will overlap it.
You ll want to order metal panels that are an appropriate color and look to complement your.
The installation of metal roof systems is a dangerous procedure and should be supervised by trained knowledgeable erectors.
Use your neoprene washer head screws to secure the metal to the sheathing.
Remove the old roof.
5v crimp roofing must be applied on a minimum roof pitch of 2 12 or greater.
For exposed fasteners avoid over tightening the fastener.
Place the first screw.
Installing corrugated roofing 1.
This video provides a basic overview of installation for palram s consumer oriented corrugated roofing products including suntuf suntop palruf sun n.
Tesla solar roof cost a tesla solar roof costs 22 to 45 per square foot which includes the solar roof tiles a powerwall roof and site repairs and complete system installation.
Some panels have pre drilled holes.
A 9 45 kw solar system installed on a 1 800 square foot roof costs between 39 600 and 81 000.
Align the first metal roofing panel so that it overlaps the edging by 1 2 to 3 4 of an inch and is square to the roof.
Measure the roof area.
Most panels come up to 32 feet 9 8 m in length.
Adjust door construction to desired size.
Make sure that the screws are all aligned evenly as you will be able to see them from the ground if they are.
Pbr panel safety study applicable osha and other safety requirements before following these instructions.
At this point chalk a line from ridge to eave.
This guide must by read and understood in its entirety before beginning installation.
5v crimp installation guidelines caution.
Install vent as close to roof peak as possible.
Cut to fit pitch of roof and around vent.
Space the screws about 12 in 30 cm apart.
Overlap roof panels one corrugation away from prevailing wind and nail to rafters starting from one end.
You will need to order enough metal material to cover the entire roof and this process.
Pre drill holes on the ridges.
Cut the panels to the desired length.
Apply front and back panels similarly to side walls.
This is intended to be a guide only and does not.
For use by its customers.