Apply a continuous bead of cement along the top of the drip edge then press down on the shingle.
Roof drip edge installation on existing roof.
Once all the underlayment is applied go back and place.
While the vertical leg should be placed 1 4 1 2 away from the fascia.
The roof leg should extend a minimum of 2 back onto the roof sheathing.
Three tips for overlapping drip edge flashing.
Coat the flat part of the flashing that sits on the deck using a putty knife.
How to fix a roof drip edge installing roof drip edge flashing properly.
Make sure the outer edge extends over the gutter.
Save yourself some.
Secure the drip edge with roofing cement.
Overlap pieces at least a couple of inches shingle style with pieces higher up on the roof overlapping pieces lower.
If it doesn t pull the drip edge out slightly from under the shingles.
To install a drip edge on a newly constructed roof or on a re roofing job attach the drip edge along the roof s eaves first.
When lapping the eave metal overlap them so the seam faces away from the direction of prevailing view.
Apply roofing cement when installing drip edge on an existing roof.
Slip the wide flat flange of the material all the way under the first course of roof shingles as illustrated.
Ask this old house general contractor tom silva demonstrates the importance of a properly installed drip edge subscribe to this old house.
Lift the shingles slide the drip edge underneath them and position it so that it extends over the gutters then replace the shingles and push down to seat the drip edge.
How to install a drip edge.